Flushing City Council
Minutes
A Regular Meeting of the Flushing City Council was called to order on Monday, April 12, 2004 at 7:30 p.m. by Mayor Janice L. Gensel, followed by the Pledge of Allegiance to the Flag and invocation.
Present: John C. Gault
Janice L. Gensel
Jay E. Johnson
Raymond Peck
Absent: Richard L. Bade
Teresa K. Salem
Michael T. Szukhent
Others Present: Dennis J. Bow, City Manager
Nancy G. Parks, City Clerk/Treasurer
Edward G. Henneke, City Attorney
Excused Absence – Motion by Johnson, seconded by Gault, to excuse the absence of Councilpersons Bade and Salem, and Mayor Pro-Tem Szukhent.
Yea: Gault, Johnson, Peck, Gensel
Nay: None
Motion Carried.
Approval of Agenda – Motion by Gault, seconded by Johnson, to approve the April 12, 2004 agenda with the removal of item C-1, Rezoning Application – S & M Lumber. This item was removed at the applicant’s request.
Yea: Gault, Johnson, Peck, Gensel
Nay: None
Motion Carried.
MEETING OPEN TO THE PUBLIC:
The following individuals addressed City Council:
Elva Cook Shirley Gauthier
CONSENT AGENDA – Motion by Gault, seconded by Peck, to approve City Council Minutes (March 22, 2004 Regular Meeting) and April 12, 2004 Council Bills List.
Yea: Gault, Johnson, Peck, Gensel
Nay: None
Motion Carried.
Flushing City Council
Minutes
Page Two
COMMUNICATIONS:
A & W Restaurant – 2004 Cruise Night Series – Motion by Gault, seconded by Peck, to approve the 2004 Cruise Night series:
April 17, 2004 August 21, 2004
May 15, 2004 September 18, 2004
June 19, 2004 October 16, 2004 (weather permitting)
July 17, 2004
Yea: Gault, Johnson, Peck, Gensel
Nay: None
Motion Carried.
REPORTS:
Flushing Trailway – Revised Design Proposal – Rowe Incorporated submitted a request to cover the cost of the re-design of the Flint River and Cole Creek bridges. The design change included changes to the bridge abutments, piers, load calculations, and plan sheet notes and dimensions. In addition, the plans are being submitted to Michigan Department of Environmental Quality (MDEQ) to determine compliance with Act 451 and possibly the re-submittal of hydraulic calculations. Also included is the assistance that the City Manager requested to provide additional programming for the funding source and revisions to the Michigan Department of Transportation (MDOT). Finally, this amendment includes work that is needed to develop new legal descriptions along the Bueche and Flushing Lumber parcels, along with construction drawings, due to changes in the path of the trail, as the result of the Bueche construction project. This project is now on track for a summer construction start.
Flushing Trailway – Revised Design Proposal – Motion by Gault, seconded by Peck, to approve the revised design proposal for the trailway, as submitted by Rowe Incorporated, in the amount of $11,690.00.
Yea: Gault, Johnson, Peck, Gensel
Nay: None
Motion Carried.
Flushing City Council
Minutes
Page Three
2004 Street Paving Program – Design and Construction Engineering Proposal - Administration has reviewed city streets, which have not been re-paved, and prepared a listing of streets that should be included in this year’s paving program. They are:
Lynn St. - entire length, replace gravel section with curb
Holland Rd. - entire length
Windmill Pt. - River Rd. to Holland Rd.
Morrish Rd. - River Rd. to City limits
Deland Rd. - Coutant St. to City limits
Riverview Blvd. - entire length, excluding new intersection
Suzanne Ct. - entire length
Cedarwood Dr. - Oakwood Dr. to dead end
Cedarwood Ct. - entire length
The fee schedule proposed by Rowe Incorporated provides a cost breakdown for the design phase and construction engineering in the amount of Sixty-Nine Thousand One Hundred and Thirty-Three ($69,133.00) Dollars. This schedule is based upon an eight week construction time frame. That time frame may vary depending on the contractor’s schedule.
Funds for this project are provided through the capital improvement fund in the amount of Six Hundred Thousand ($600,000.00) Dollars, which includes engineering design and construction.
2004 Street Paving Program – Design and Construction Engineering Proposal – Motion by Peck, seconded by Gault, to approve the Design and Construction Engineering proposal for the 2004 Street Paving Program as submitted by Rowe Incorporated in the amount of $69,133.00.
Yea: Gault, Peck, Gensel
Nay: Johnson
Motion Carried.
ITEMS
FOR FUTURE PUBLIC HEARINGS:
2004-2005 Budget – Motion by Johnson, seconded by Gault, to set a public hearing on the 2004-2005 Budget for Monday, April 26, 2004 at 7:30 p.m. at 309 E. Main Street.
Yea: Gault, Johnson, Peck, Gensel
Nay: None
Motion Carried.
Flushing City Council
Minutes
Page Four
OLD
BUSINESS:
Genesee County Growth Alliance – Motion by Gault, seconded by Johnson, to approve the City of Flushing’s participation in the Genesee County Growth Alliance at an annual cost of $2,500.00.
Yea: Gault, Johnson, Peck, Gensel
Nay: None
Motion Carried.
Adjournment – Motion by Johnson, seconded by Gault, to adjourn.
Yea: Gault, Johnson, Peck, Gensel
Nay: None
Motion Carried.
Adjourn: 8:13 p.m.
_____________________________ ______________________________